Contractor’s will begin erecting temporary chain-link safety fencing alongside the Mispillion River beginning the week of Monday, April 10. This is in preparation for the demolition and removal of the existing guardrail system located on the Riverwalk between South Washington and South Walnut streets. This will not prevent any pedestrian access to the Riverwalk, and is just a precautionary measure while this project is under construction.